ENVISION has extensive experience in meeting the compliance demands of the Passaic Valley Sewerage Commissioners (PVSC) Rules and Regulations. These services include the following:
Completion and submission of MR-1, MR-2 and MR-3 forms;
Collection and analysis of wastewater samples;
Preparation of PVSC Slug Loadings Control Questionnaires, Local Limit BMRs, and other reporting requirements;
Preparation of initial sewer connection permit applications and 5-year renewal applications;
Development and implementation of compliance management programs, including NOV reduction negotiations;
Design, installation and operations of pH monitoring and control systems;
Interaction with regulatory personnel;
Assessment of existing wastewater treatment systems to increase performance and efficiency;
Facility profile investigations to determine water usage and to characterize processes that contribute to the wastewater outflow of the facility;
Waste minimization studies; and
Compliance determinations with the Industrial Pretreatment Program (IPP).